LNG Operational Practice: 2026 [paper]
3rd Edition | 1918766246 | Available end October 2026
Reserveer alvast een exemplaar
- ISO 9001 / AS 9120 gecertificeerd voor 100% klanttevredenheid
- Officiele distributeur van o.a. IATA, IMO en ICAO
- Behulpzame klantenservice voor al je vragen!
Samenvatting
Extra
LNG Operational Practice, 3rd Edition 2026
It’s a practical handbook for LNG carrier officers, shipboard personnel and maritime professionals involved in the safe and efficient operation of liquefied natural gas (LNG) carriers.
Updated to reflect the latest amendments to the IGC Code, current LNG shipping practices and emerging technologies, this edition provides step-by-step operational guidance, clear diagrams, checklists, instructions and explanations of the underlying chemistry of LNG cargo operations.
What’s new in the 3rd Edition?
The 2026 edition incorporates updated technical guidance and operational experience from modern LNG shipping. New and revised content includes:
- Updated regulatory guidance reflecting the latest amendments to the International Gas Carrier (IGC) Code.
- Floating LNG facilities and custody transfer surveys.
- Revised operational procedures covering in-service operations and departure from the load port.
- Expanded post-discharge guidance, including planning considerations for subsequent voyages.
- Updated 3D operational models, with annotations and colour-coded flow arrows to clarify processes, particularly during cargo tank drying, inerting and gassing-up.
Covers the complete LNG carrier trading cycle, from post-dry dock operations and cargo tank preparation to loading, discharge, ship-to-ship transfer and dry dock preparation. Presents procedures in a logical sequence, with practical guidance on LNG cargo handling, equipment processes and the technical principles behind each operation.
Who should read this book?
It’s an essential technical reference for:
- LNG carrier officers and shipboard personnel.
- Deck officers preparing to transition to LNG carrier operations.
- Maritime professionals seeking practical knowledge of LNG cargo handling.
- Officers looking to refresh their understanding of modern LNG carrier procedures.
Combining practical instructions, operational diagrams and current industry experience, this edition supports a clear understanding of LNG carrier operations from dry dock preparation through the full cargo trading cycle.
As highlighted in the foreword by Emil Karlovic, Master at MOL LNG Transport (Europe), the updated edition reinforces the book’s value as a key onboard reference for LNG carrier officers.
Also available as e-reader, please contact us for more information!
1918766246, 9781918766246, LNG Operational Practice, 3rd Edition 2026, LNG Carrier Operations
Preface
Acknowledgements
Section 1: General Information
1 Physical Properties, Composition and Characteristics of LNG
1.1 Overview
1.2 Flammability of LNG
1.3 Saturated Vapour Pressure (SVP)
1.4 Vapour Density
1.5 Safety Precautions in LNG Handling
2 Normal Trading Cycle of an LNGC
3 Cargo Containment Systems
3.1 Overview
3.2 Moss Rosenberg (Moss)
3.3 Mark III (GTT
3.4 NO96 (GTT)
4 Cargo Handling Equipment
4.1 Cargo Pump
4.2 Spray/Stripping Pump
4.3 High Duty Compressor
4.4 Low Duty Compressor
4.5 Gas Heater
4.6 Vaporiser
4.7 Reliquefaction Plant
4.8 Gas Combustion Unit (GCU)
5 Auxiliary Equipment
5.1 The Cargo Valves Remote Control System
5.2 Ship/Shore Link and ESD System
5.3 N2 Generator
5.4 IG Plant
5.5 Custody Transfer and Measurement System (CTMS)
5.6 Cargo Tank Gauging System
5.7 Gas Detection Equipment
5.8 Cofferdam Heating System
5.9 Vacuum Pumps
5.10 Tank Overflow Protection
Section 2: Post Dry-dock Operations
6 Operations Related to Auxiliary Systems
6.1 Moss Type LNG Carriers
6.2 Membrane Type LNG Carriers (Mark III and NO96)
7 Cargo Tank Operations
7.1 Drying of Cargo Tanks
7.2 Inerting of Cargo Tanks
7.3 Gassing-up the Cargo Tanks
7.4 Initial Cooldown of Cargo Tanks
Section 3: In-service Operations
8 Loading Operations
8.1 Overview
8.2 Preparation for Loading
8.3 Pre-loading Operations
8.4 Cooldown for Loading
8.5 Ramp-up to Bulk Rate
8.6 Bulk Rate Loading
8.7 Ramp-down
8.8 Post-loading Operations
8.9 Departure from Load Port
9 Laden Voyage
9.1 Overview
9.2 Laden Voyage of LNG Carriers with Gas Burning Propulsion System
9.3 Laden Voyage of LNG Carriers with Reliquefication Plant
9.4 Further Considerations on Laden Voyage
10 Discharge Operations
10.1 Overview
10.2 Preparation for Discharge
10.3 Pre-discharge Operations
10.4 Ramp-up to Bulk Rate
10.5 Operational Description – Bulk Rate Discharge
10.6 Ramp-down
10.7 Post-discharge Operations
10.8 Departure from Discharge Port
10.9 Further Considerations During Discharge
11 Ballast Voyage
11.1 Overview
11.2 Heel Management
11.3 Further Considerations on Ballast Voyage
12 Ship to Ship Transfer Operations
12.1 Pre-arrival Stage
12.2 Approach and Mooring Stage
12.3 Cargo Transfer Stage
12.4 Post-transfer Procedure
Section 4: Pre Dry-dock Preparations
13 Cargo Tank Operations
13.1 Warming up Cargo Tanks
13.2 Inerting of Cargo Tanks
13.3 Aeration of Cargo Tanks
Glossary
Wat klanten zeggen



Chris Herickx
Zeer klantvriendelijk en altijd klaar om te helpen. Mails met vragen worden heel snel beantwoord
TMA Logistics
Goede service. Werd netjes gebeld dat er binnenkort een nieuwe versie uitkwam. en of ik hierop wilde wachten. Bovenkant
Scott Specialty Gases NL
Vlotte en duidelijke communicatie, levering zoals afgesproken.
TLogistics BV
Erg goed. Boek was niet op voorraad, maar werd redelijk snel geleverd