Floating LNG Installations – 2021
This document covers two critical areas when considering floating LNG installations:
1. Technical assessment
2. Operations
The technical assessment section provides guidance on the considerations for a floating LNG installation project. This includes pre-front-end engineering design and front-end engineering design (pre-FEED/FEED) data collection and design criteria, physical location and site assessment, the applicable floating LNG installations to consider and project overview from commissioning to end of life.
The operations section reinforces best practices for the safe operation of floating LNG installations and their associated infrastructure. Recommendations are based on mitigating identified risks and hazards.