AWWA C810 Replacement and Flushing of Service: 2017 [paper]
AWWA C810 Replacement and Flushing of Lead Service Lines
This standard describes essential procedures for the replacement of lead water service lines and flushing following replacement. Essential procedures include the following: appropriate tools and techniques; flushing a service line after replacement; factors to consider in optimizing flushing; and instructions to provide customers affected by the replacement, including additional risk reduction measures. This standard also describes procedures for partial replacement and repair situations where complete lead service line replacement is not possible or practical.
The purpose of this standard is to define the minimum process requirements for the replacement of lead service lines and for flushing following replacement.
This standard can be referenced in the purchase documents for the replacement of lead service lines and can be used as a guide for the appropriate replacement tools and techniques, flushing practices and procedures, communications with customers, and verification of successful completion. The stipulations of this standard apply when this document has been referenced and only to the extent referenced.
9781625762696, AWWA,Water Distribution Systems
Chris Herickx
Zeer klantvriendelijk en altijd klaar om te helpen. Mails met vragen worden heel snel beantwoord
TMA Logistics
Goede service. Werd netjes gebeld dat er binnenkort een nieuwe versie uitkwam. en of ik hierop wilde wachten. Bovenkant
Scott Specialty Gases NL
Vlotte en duidelijke communicatie, levering zoals afgesproken.
TLogistics BV
Erg goed. Boek was niet op voorraad, maar werd redelijk snel geleverd