ASME BPVC Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities
Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied.
Division 2
This Division provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants, it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program
More on BPVC – Nuclear:
ASME BPVC.XI.1-2025 – Section XI, Division 1, Rules for Inservice Inspection of Nuclear Power Plant Components
ASME BPVC.XI.2-2025 – Section XI, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities
Available on request:
ASME BPVC.III-2025 SET – Section III, COMPLETE 11-Volume Set
ASME BPVC.III.1-2025 SET – Section III, Division 1, COMPLETE 7-Volume Set
ASME BPVC.III.NCA-2025 – Section III, Subsection NCA, General Requirements for Division 1 and Division
ASME BPVC.III.A-2025 – Section III, Appendices
ASME BPVC.III.1.NB-2025 – Section III, Division 1, Subsection NB, Class 1 Components
ASME BPVC.III.1.NCD-2025 – Section III, Division 1, Subsection NCD, Class 2 and Class 3 Components
ASME BPVC.III.1.NE-2025 – Section III, Division 1, Subsection NE, Class MC Components
ASME BPVC.III.1.NF-2025 – Section III, Division 1, Subsection NF, Supports
ASME BPVC.III.1.NG-2025 – Section III, Division 1, Subsection NG, Core Support Structures
ASME BPVC.III.2-2025 – Section III, Division 2, Code for Concrete Containments
ASME BPVC.III.3-2025 – Section III, Division 3, Containment Systems for Transportation and Storage of Spent Nuclear Fuel and High-Level Radioactive Material
ASME BPVC.III.4-2025 – Section III, Division 4, Fusion Energy Devices
ASME BPVC.III.5-2025 – Section III, Division 5, High Temperature Reactors
On request also available as:
ASME BPVC – Print and online subscription (online subscription is a single user license that will expire 24 months from delivery)
ASME BPVC online year subscription
This product is restricted and cannot be purchased in the following countries Ukraine, Russia, Belarus
9780791877289, 500112, ASME BPVC 2025
Chris Herickx
Zeer klantvriendelijk en altijd klaar om te helpen. Mails met vragen worden heel snel beantwoord
TMA Logistics
Goede service. Werd netjes gebeld dat er binnenkort een nieuwe versie uitkwam. en of ik hierop wilde wachten. Bovenkant
Scott Specialty Gases NL
Vlotte en duidelijke communicatie, levering zoals afgesproken.
TLogistics BV
Erg goed. Boek was niet op voorraad, maar werd redelijk snel geleverd